Dear Editor:
We would like to thank the roads board of Robinson Township for initiating the road work on Beach Road this summer. After the ice left this spring, it took about eight feet of the north verge of the road with it! It seemed that one more winter would leave us with part of the road in the lake!
The roads board inspected the area along with the Ministry of Transportation representative and a couple of weeks ago, Emcon Services Inc. did a terrific job of building a breakwall in that area of the road that will shore up the road during this time of high water levels on Lake Huron. Thank you very much to all of the people mentioned above.
The residents of Beach Road
Robinson Township